Chapel Allerton images

  • Client – Aldi Food stores  
  • Site name – Former Yorkshire Bank Head Office  
  • Address - Harrogate Rd, Chapel Allerton, Leeds LS7 3PD
  • Contract Value = £210,000.00
  • Steel recovery – 220 tons
  • Programme – 12 weeks. 
  • Date – September 2017

 

Aldi Food stores purchased the former Yorkshire Bank head office in 2017, with a view to demolishing the existing 4-floor superstructure, removing of underground vault substructure and constructing a new retail store with associated car parking.

The former bank was constructed from a steel frame design with precast Bison slab floors and mass masonry infill walls throughout with ribbon windows on each floor plate. The basement structure which housed the former vault was a mass-filled concrete design, which was heavily reinforced with steel 16mm steel rebar. Due to the strength of the concrete during removal, it was assumed the concrete was a purpose-designed high-strength mix with a granite aggregate additive.

KayeDem was initially appointed to carry out all asbestos removal within the structure, which consisted of Asbestos insulating board (AIB), asbestos-containing cement products and various textile products. Following the asbestos removal and soft strip out of the former bank head office, Kayedem demolished the high-rise structure by use of Komatsu, PC490HRD-10 High Reach demolition excavator which progressively demolished the steel-framed structure.

The underground vault structure was broken out by the use of 30-ton Doosan DX 300 excavators with hydraulic hammer attachments and Pulverisers to break down the immense sub-structure. The entire underground structure was excavated, and all suitable arisings were crushed by the use of a Terex XR400 jaw crusher to a recycled aggregate product, commonly known as 6F2. which consists of concrete and brick crushed down to form a 75mm to dust aggregate product. This product was used to backfill the basement area, which was completed in 300mm layers and compacted by the use of a Hamm vibrating roller to achieve the specified compaction rating.

News articles - https://www.yorkshireeveningpost.co.uk/news/video-demolition-north-leeds-eyesore-building-begins-607256

https://www.yorkshireeveningpost.co.uk/news/building-work-aldi-store-leeds-suburb-will-start-next-summer-611787